Ready Steady Rules

Kitchen exhaust duct baseline degrease

A full baseline clean of your kitchen exhaust system — canopy, ductwork and fan — before you open, so the system starts life certified clean rather than picking up an unknown amount of grease from the fit-out and commissioning period.

A full baseline clean of your kitchen exhaust system — canopy, ductwork and fan — before you open, so the system starts life certified clean rather than picking up an unknown amount of grease from the fit-out and commissioning period. Singapore does not name a single benchmark the way BESA's TR19 does in the UK: SCDF's own Fire Code accepts two grease-deposit thickness standards — the UK's TR19 Grease standard (200 microns) and the US NFPA 96 standard (2000 microns) — so either benchmark, properly certified, satisfies the requirement.

Grease buildup in ductwork is a leading cause of commercial kitchen fires, and it is checked as part of SFA's food-establishment inspection regime alongside your fire safety obligations. Starting with a certified baseline clean also gives you a clean reference point for the recurring 12-monthly degrease that goes on your Compliance Calendar once you are trading, instead of an unknown starting condition.

WHEN
1-2 weeks to book and complete
COST
Not independently confirmed
indicative, checked 2026-09
WHO DOES IT
A qualified contractor
LEGAL BASIS
SCDF Fire Code (Code of Practice for Fire Precautions in Buildings); checked as part of SFA's licensed-premises inspection regime.
What Singapore's kitchen exhaust cleaning standard actually requires

We don't yet have a vetted Singapore contractor directory — ask your landlord or trade association for a recommendation.

Who this is for

Any kitchen with a mechanical extract hood and ductwork installed as part of your fit-out.

Applies wherever an extract hood is fitted; venues without mechanical extraction (e.g. drinks-only bars) are out of scope.

What you’ll hold

  • Baseline cleaning certificate, dated, stating the standard used (TR19 or NFPA 96) and the measured deposit thickness
  • A note of the next due date, 12 months on

Watch out for

Sources

See also

This is item 20 of 36 in the free Singapore Launch Checklist. See the whole list →