Prove the extract meets the gas interlock and planning conditions

Confirmation that your kitchen extract system actually provides the airflow and make-up air your gas interlock and any planning conditions (odour, noise, discharge height) need.

Confirmation that your kitchen extract system actually provides the airflow and make-up air your gas interlock and any planning conditions (odour, noise, discharge height) need. Not a certificate of its own — a check that the extract, make-up air and gas safety interlock all work together as designed.

A gas interlock certificate (CP42) only tests that the interlock switches off gas when the fan stops. It does not confirm the extract rate itself is adequate for your equipment or that your planning permission's odour and noise conditions are met — getting this wrong causes call-backs, planning enforcement, or a kitchen that cannot run at full capacity because make-up air is insufficient.

WHEN
Coordinate alongside your gas and extract installation
COST
Usually covered within your extract installation/commissioning cost
indicative, checked 2026-08
WHO DOES IT
A qualified contractor
LEGAL BASIS
Gas Safety (Installation and Use) Regulations 1998 (interlock); planning conditions attached to your premises; HSE and CIBSE ventilation guidance.
Coordinate extract, make-up air and interlock commissioning

Ask your gas engineer and your extract installer to confirm to each other, in writing, that the measured extract rate and make-up air satisfy the interlock and any planning conditions.

Who this is for

Any kitchen with mechanical extraction, especially where planning conditions specify odour control or extract height.

What you’ll hold

  • Extract airflow commissioning record
  • Planning condition discharge confirmation, if applicable