A re-inspection of every asbestos-containing (or presumed) material listed in your asbestos register and management plan, checking each one for damage or deterioration and updating the register with the findings.

A re-inspection of every asbestos-containing (or presumed) material listed in your asbestos register and management plan, checking each one for damage or deterioration and updating the register with the findings.

Material that was in good condition at your original survey can be damaged later by building work, water ingress, knocks or simple wear. The law requires you to keep managing the risk, not just to have surveyed it once.

WHEN
At least once a year as a baseline, and sooner than that if any material is in poor condition, has been disturbed, or before any building work in an area where it is present.
COST
£150–£450 for a management plan review and re-inspection visit
indicative, checked 2026-08
WHO DOES IT
A qualified contractor
R18
LEGAL BASIS
Control of Asbestos Regulations 2012, regulation 4 (duty to manage asbestos in non-domestic premises).
Find an asbestos surveyor

Ask specifically for a UKAS-accredited asbestos surveyor experienced in management re-inspections, not just a general asbestos removal contractor.

Who this is for

Any venue in a pre-2000 building whose asbestos survey identified asbestos-containing or presumed materials.

What you’ll hold

  • Updated asbestos register with the re-inspection date and findings
  • Photographs of any material showing wear or damage
  • Revised management plan if the condition of any material has changed

Watch out for