Ready Steady Rules

Asbestos management survey

If your building was constructed or last refurbished before 2000, it may contain asbestos in places like ceiling tiles, pipe lagging, floor tiles, textured coatings and behind panelling.

If your building was constructed or last refurbished before 2000, it may contain asbestos in places like ceiling tiles, pipe lagging, floor tiles, textured coatings and behind panelling. A management survey identifies what's there and where, so you can plan a fit-out around it safely — and if you're not sure of the building's age, get the survey rather than guess.

As the person in control of the premises you become the "dutyholder" under asbestos regulations the moment you take occupation, whether you knew about any asbestos or not. Disturbing asbestos-containing materials during fit-out without a survey is a serious HSE enforcement matter and a genuine health risk to your contractors and, later, your staff.

WHEN
2-3 weeks to commission and report
COST
Typically £300–£800 for a management survey depending on building size
indicative, checked 2026-08
WHO DOES IT
A qualified contractor
F10
LEGAL BASIS
Control of Asbestos Regulations 2012, reg. 4 (duty to manage asbestos in non-domestic premises).
Find an asbestos surveyor

Use a UKAS-accredited surveyor. A refurbishment/demolition survey may be needed instead of a management survey if you're stripping out extensively.

Who this is for

Any venue taking on a building built or refurbished before 2000, including if you genuinely don't know the building's age.

Applies to the non-domestic parts of the building you occupy or are responsible for maintaining, including shared or landlord-controlled areas where you have access.

What you’ll hold

  • Asbestos management survey report
  • Asbestos register and management plan

Watch out for

Sources

See also

This is item 4 of 66 in the free UK Launch Checklist. See the whole list →