Electrical installation licence, if your load is high

A licence from the Energy Market Authority (EMA) covering higher-load electrical installations, generally required above roughly 45kVA of connected load — the kind of load a commercial kitchen with heavy equipment can reach even where the average bar or café doesn’t.

Not yet independently verified — check the source link: EMA’s exact licensing thresholds and the precise scope of when a Licensed Electrical Worker sign-off is mandatory were not independently fetched from a single authoritative EMA page this pass. Confirm before relying on the 45kVA figure below.

A licence from the Energy Market Authority (EMA) covering higher-load electrical installations, generally required above roughly 45kVA of connected load — the kind of load a commercial kitchen with heavy equipment can reach even where the average bar or café doesn’t. Where it applies, you need a Licensed Electrical Worker (LEW) to design, install and sign off the installation.

Operating a high-load electrical installation without the required licensing and LEW sign-off is a safety and regulatory risk, and it is the kind of thing that surfaces at the worst possible time — during a fit-out inspection, an insurance claim, or after a fault. Confirm early whether your setup crosses the threshold, since retrofitting sign-off after installation is more disruptive than planning for it upfront.

WHEN
not independently confirmed — engage a Licensed Electrical Worker early
COST
Not independently confirmed
indicative, checked 2026-09
WHO DOES IT
A qualified contractor
LEGAL BASIS
Electricity Act and its subsidiary regulations, administered by EMA.
Find a Licensed Electrical Worker

We don’t yet have a vetted directory for Singapore — ask your landlord or trade association for a recommendation.

Who this is for

Any venue with a high electrical load — most likely a kitchen-heavy restaurant with multiple large appliances rather than a small drinks-only bar.

Applies above roughly 45kVA of connected load — confirm your actual load with an electrical contractor or LEW before assuming you’re under the threshold.

What you’ll hold

  • LEW sign-off / installation certificate for your electrical works

Watch out for

Sources

See also

This is item 7 of 36 in the free Singapore Launch Checklist. See the whole list →